Paver sealing in Heron Bay motor courts
Heron Bay was built from 1996 into the early 2000s, and a lot of its drives are original pavers that have been through twenty-plus rainy seasons. Some were sealed years ago with a film that has since gone patchy or white. A film sealer that has failed has to come off before anything new goes on, and that stripping step is a day of its own.
The motor court is also where the cars turn, so the joints nearest the garage lose sand fastest and the faces carry the most tire marks. Those joints are blown out, refilled with polymeric sand and set before the sealer goes down. Done in that order, the court stops shedding sand into the gutter every July.


